Finished off more photographs.
Took all work into uni and set it up for review.
Visited the Chine took more photo's with all the snow landscape.
Bournemouth Pier and the beach covered in snow!!
Small bridge in Bournemouth Gardens
View across Bournemouth Gardens
The Wessex Way bridge in snow!
The rear of the Wessex Way bridge all covered in thick snow!!
DANIEL DICKENS RIBA BA (Hons) ARCHITECTURAL PART ONE QUALIFIED. Photography of the chine is my Special studies unit. The unit reflects upon Bournemouth's Chine/gardens. I decided to Express my skills using Photography and developing this in a different style of broken images and cubism. My EMP consists of designing a hotel which links the urban context of Bournemouth Sea front. My scheme is to design a hotel which has a Surf school included for all year round surfing.
Friday, 3 December 2010
Wednesday, 1 December 2010
Sunday, Monday, Tueday's Work
28.11.10 - 1.12.10
Completed the storage box
Completed all the CAD drawings
Completed all the research doc
Completed more photo montages
The box completed door closed
The box with doors open you can see some work inside
The CAD 3D drawing model of the box.
Completed the storage box
Completed all the CAD drawings
Completed all the research doc
Completed more photo montages
The box completed door closed
The box with doors open you can see some work inside
The CAD 3D drawing model of the box.
Saturday, 27 November 2010
Saturday's Work 27.11.10
Added shelves to the storage box and added doors with handles.
Took further photographs of the finished Cubism game.
Top view of the Cubism piece
Side view of the cubism piece you can see the different levels of the blocks created for different depths
Front view of the storage box with the doors and handles added
Front view with the doors open looking inside the box. Shelves have been added to allow the work to be stored neatly.
Took further photographs of the finished Cubism game.
Top view of the Cubism piece
Side view of the cubism piece you can see the different levels of the blocks created for different depths
Front view of the storage box with the doors and handles added
Front view with the doors open looking inside the box. Shelves have been added to allow the work to be stored neatly.
Friday, 26 November 2010
Friday's Work 26.11.10
Completed the large cubism piece with all velcro stuck onto the back.
Completed the small storage box for the rubik's cube.
The large cubism piece completed
The front of the Rubik's cube box
The inside of the box showing the two Rubik's cubes inside.
Showing the applying of the Velcro on the board which the cubes stick to.
Completed the small storage box for the rubik's cube.
The large cubism piece completed
The front of the Rubik's cube box
The inside of the box showing the two Rubik's cubes inside.
Showing the applying of the Velcro on the board which the cubes stick to.
Thursday's Work 25.11.10
Painted more of the storage box all the black out lines are now complete waiting for the colour panels to be added.
Finished off painting the small cubes for the cubism piece.
The storage box with black out lines completed.
Finished off painting the small cubes for the cubism piece.
The storage box with black out lines completed.
Wednesday, 24 November 2010
Tuesday's Work 23.11.10
Completed a Large Image on A1 showing Wessage way bridge in Hockney style.
Placed a grid on the storage box
The A1 image I created of the Wessex Way bridge
Grid on the Box
Beginning of the painting stage on the box done 24.11.10
Placed a grid on the storage box
The A1 image I created of the Wessex Way bridge
Grid on the Box
Beginning of the painting stage on the box done 24.11.10
Monday, 22 November 2010
Monday's Working 22-11-10
22-11-10.
Cube box design underway. shelving to be added and paint colours.
Montage of further images completed.
Image of my individual images montaged together creating one large image.
The start of the large Cubism piece.
Images and work copy righted to myself.
Subscribe to:
Posts (Atom)