Monday, 16 May 2011

Further Development Work of the Project

These are some images of my development work as this project is getting further along, there are also some images of things which have given me inspiration for inside my hotel/surf school and a brief look at some materials I have looked at. 

VW Surf Van

Biomass boiler inspiration used for the heating water element

A corridor montage with a surfer visitor inside

An example of an acoustic wall panel

Materials board

Materials board

Materials board

Materials board

Materials board

Materials board

Steelwork within the mezzanine floor

Section of model glass facade

Plan and elevation for tracing over A1, 1:200 scale

Site with hotel on early A1, 1:500 scale

Spider bracket

No comments:

Post a Comment